{"id":37,"date":"2026-09-12T14:09:04","date_gmt":"2026-09-12T11:09:04","guid":{"rendered":"https:\/\/marbledesign.com.tr\/?page_id=37"},"modified":"2026-09-12T14:09:04","modified_gmt":"2026-09-12T11:09:04","slug":"natural-stone-project-supply","status":"publish","type":"page","link":"https:\/\/marbledesign.com.tr\/?page_id=37","title":{"rendered":"Natural stone supply for construction projects"},"content":{"rendered":"<section lang=\"en\">\n<p><strong>ENGLISH<\/strong><\/p>\n<h2>Natural stone supply for construction projects<\/h2>\n<p>Coordinate natural stone procurement around the demands of your build. Marble Design supports construction companies and project teams with large-volume stone sourcing, cut-to-size supply and project-specific installation scopes.<\/p>\n<h3>Procurement that starts with the programme<\/h3>\n<p>For multi-unit residential, hospitality and commercial developments, the stone package needs to align with drawings, quantities and the construction schedule. We review the material brief and proposed supply sequence with you before defining an offer.<\/p>\n<h3>Large-volume supply with selection in mind<\/h3>\n<p>We work with quarry and production partners to source material against an agreed brief. Discuss selection ranges, finish, dimensions and batch consistency at the outset. Supply capacity and timing are assessed for the specific material and quantity, rather than assumed from catalogue images.<\/p>\n<h3>From cut-to-size supply to installation<\/h3>\n<p>Depending on the location and project scope, we can discuss a supply-and-installation package, including turnkey natural stone works. Site measurement, substrate readiness, fixing requirements, installation responsibilities and handover criteria must be defined in the project agreement.<\/p>\n<h3>Plan each delivery around the site<\/h3>\n<p>Where the project calls for phased deliveries, we can discuss quantities by zone, packing identification, unloading arrangements and the destination. Production, freight and site dates are coordinated against a programme confirmed during the quotation and order process.<\/p>\n<h3>How we work<\/h3>\n<ol>\n<li><strong>Define the package<\/strong> \u2014 Share the bill of quantities, drawings and procurement schedule.<\/li>\n<li><strong>Review responsibilities<\/strong> \u2014 Agree material selection, technical requirements and supply or installation boundaries.<\/li>\n<li><strong>Coordinate the programme<\/strong> \u2014 Set material approvals and proposed production and delivery stages.<\/li>\n<\/ol>\n<h3>Frequently asked questions<\/h3>\n<h4>Do you work on high-volume projects?<\/h4>\n<p>Yes. We discuss large-volume requirements with construction companies and project teams. Capacity, material availability, production lead times and commercial terms are confirmed for each enquiry.<\/p>\n<h4>Is installation available for every destination?<\/h4>\n<p>Installation is assessed by location, scope and site conditions. A supply-and-installation offer is made only after responsibilities and practical requirements have been reviewed.<\/p>\n<h4>Can deliveries be divided into phases?<\/h4>\n<p>Phased delivery can be discussed against the construction programme. Batch planning, storage, transport and any resulting costs must be agreed before ordering.<\/p>\n<h4>What do you need for a US project quotation?<\/h4>\n<p>Send the project city and state, drawings or quantities, specifications, target dates and intended delivery point. Include any project standards and whether you need supply only or an installation scope reviewed.<\/p>\n<h3>Discuss your stone package<\/h3>\n<p>Send the bill of quantities, drawings, specifications, project location, construction schedule and whether your enquiry includes installation.<\/p>\n<p><a href=\"mailto:info@marbledesign.com.tr\">info@marbledesign.com.tr<\/a> \u00b7 <a href=\"https:\/\/wa.me\/905319449373?text=Hello%2C%20I%20would%20like%20to%20discuss%3A%20Natural%20stone%20supply%20for%20construction%20projects\">WhatsApp<\/a><\/p>\n<\/section>\n<hr>\n<section lang=\"tr\">\n<p><strong>T\u00dcRK\u00c7E<\/strong><\/p>\n<h2>\u0130n\u015faat projeleri i\u00e7in do\u011fal ta\u015f tedariki<\/h2>\n<p>Do\u011fal ta\u015f al\u0131m\u0131n\u0131 in\u015faat\u0131n\u0131z\u0131n ihtiya\u00e7lar\u0131yla birlikte planlay\u0131n. Marble Design; in\u015faat firmalar\u0131 ve proje ekipleri i\u00e7in y\u00fcksek miktarl\u0131 ta\u015f tedariki, ebatl\u0131 \u00fcr\u00fcnler ve projeye \u00f6zel uygulama kapsamlar\u0131n\u0131 de\u011ferlendirir.<\/p>\n<h3>\u0130\u015f program\u0131yla ba\u015flayan sat\u0131n alma<\/h3>\n<p>\u00c7ok konutlu yerle\u015fimler, oteller ve ticari yap\u0131larda ta\u015f i\u015flerinin \u00e7izimler, metrajlar ve in\u015faat takvimiyle uyumlu olmas\u0131 gerekir. Teklif kapsam\u0131ndan \u00f6nce malzeme tan\u0131m\u0131n\u0131 ve \u00f6nerilen tedarik s\u0131ras\u0131n\u0131 birlikte inceleriz.<\/p>\n<h3>Seleksiyonu g\u00f6zeten y\u00fcksek miktarl\u0131 tedarik<\/h3>\n<p>Kararla\u015ft\u0131r\u0131lm\u0131\u015f malzeme tan\u0131m\u0131na g\u00f6re ocak ve \u00fcretim ortaklar\u0131yla \u00e7al\u0131\u015f\u0131r\u0131z. Seleksiyon aral\u0131\u011f\u0131, y\u00fczey, \u00f6l\u00e7\u00fcler ve partiler aras\u0131ndaki uyum ba\u015flang\u0131\u00e7ta ele al\u0131n\u0131r. Tedarik kapasitesi ve s\u00fcre, katalog g\u00f6rsellerinden varsay\u0131lmadan malzeme ve miktar \u00f6zelinde de\u011ferlendirilir.<\/p>\n<h3>Ebatl\u0131 tedarikten uygulamaya<\/h3>\n<p>Projenin konumu ve kapsam\u0131na g\u00f6re anahtar teslim do\u011fal ta\u015f i\u015fleri dahil tedarik ve uygulama paketini g\u00f6r\u00fc\u015febiliriz. Yerinde \u00f6l\u00e7\u00fc, alt y\u00fczey haz\u0131rl\u0131\u011f\u0131, sabitleme gereklilikleri, uygulama sorumluluklar\u0131 ve teslim kriterleri proje s\u00f6zle\u015fmesinde tan\u0131mlan\u0131r.<\/p>\n<h3>\u015eantiyeye uygun teslim plan\u0131<\/h3>\n<p>Etapl\u0131 teslim gereken projelerde b\u00f6l\u00fcmlere g\u00f6re miktarlar, paket tan\u0131mlar\u0131, bo\u015faltma ko\u015fullar\u0131 ve teslim yeri ele al\u0131n\u0131r. \u00dcretim, ta\u015f\u0131ma ve \u015fantiye tarihleri teklif ve sipari\u015f s\u00fcrecinde teyit edilen programa g\u00f6re koordine edilir.<\/p>\n<h3>Nas\u0131l \u00e7al\u0131\u015f\u0131yoruz?<\/h3>\n<ol>\n<li><strong>\u0130\u015f paketini tan\u0131mlay\u0131n<\/strong> \u2014 Metraj, \u00e7izimler ve sat\u0131n alma program\u0131n\u0131 payla\u015f\u0131n.<\/li>\n<li><strong>Sorumluluklar\u0131 netle\u015ftirelim<\/strong> \u2014 Malzeme, teknik beklentiler ve tedarik ile uygulama s\u0131n\u0131rlar\u0131n\u0131 g\u00f6r\u00fc\u015felim.<\/li>\n<li><strong>Program\u0131 olu\u015ftural\u0131m<\/strong> \u2014 Malzeme onaylar\u0131n\u0131, \u00fcretim ve teslim a\u015famalar\u0131n\u0131 planlayal\u0131m.<\/li>\n<\/ol>\n<h3>S\u0131k sorulan sorular<\/h3>\n<h4>B\u00fcy\u00fck miktarl\u0131 projelerde \u00e7al\u0131\u015f\u0131yor musunuz?<\/h4>\n<p>Evet. \u0130n\u015faat firmalar\u0131 ve proje ekiplerinin y\u00fcksek miktarl\u0131 ihtiya\u00e7lar\u0131n\u0131 de\u011ferlendiriyoruz. Kapasite, malzeme bulunabilirli\u011fi, \u00fcretim s\u00fcresi ve ticari ko\u015fullar her talep i\u00e7in ayr\u0131ca teyit edilir.<\/p>\n<h4>Her b\u00f6lgede uygulama yap\u0131labiliyor mu?<\/h4>\n<p>Uygulama; konum, kapsam ve saha ko\u015fullar\u0131na g\u00f6re de\u011ferlendirilir. Sorumluluklar ve pratik gereklilikler incelendikten sonra tedarik ve uygulama teklifi olu\u015fturulur.<\/p>\n<h4>Teslimatlar etaplara ayr\u0131labilir mi?<\/h4>\n<p>\u0130n\u015faat program\u0131na g\u00f6re etapl\u0131 teslim g\u00f6r\u00fc\u015f\u00fclebilir. Parti plan\u0131, depolama, nakliye ve bunlar\u0131n maliyetleri sipari\u015f \u00f6ncesinde kararla\u015ft\u0131r\u0131l\u0131r.<\/p>\n<h4>ABD projesi teklifi i\u00e7in ne gerekiyor?<\/h4>\n<p>Projenin \u015fehir ve eyaletini, \u00e7izimleri veya metrajlar\u0131, \u015fartnameyi, hedef tarihleri ve teslim noktas\u0131n\u0131 g\u00f6nderin. Proje standartlar\u0131n\u0131 ve yaln\u0131z tedarik mi, uygulama de\u011ferlendirmesi de mi istedi\u011finizi belirtin.<\/p>\n<h3>Ta\u015f i\u015flerinizi g\u00f6r\u00fc\u015felim<\/h3>\n<p>Metraj, \u00e7izimler, teknik \u015fartname, proje konumu, i\u015f program\u0131 ve uygulama talebiniz olup olmad\u0131\u011f\u0131n\u0131 payla\u015f\u0131n.<\/p>\n<p><a href=\"mailto:info@marbledesign.com.tr\">info@marbledesign.com.tr<\/a> \u00b7 <a href=\"https:\/\/wa.me\/905319449373?text=Merhaba%2C%20bilgi%20almak%20istiyorum%3A%20%C4%B0n%C5%9Faat%20projeleri%20i%C3%A7in%20do%C4%9Fal%20ta%C5%9F%20tedariki\">WhatsApp<\/a><\/p>\n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>Large-volume natural stone and cut-to-size marble supply for construction projects. Discuss phased deliveries and project-specific installation with Marble Design.<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"hero_heading":"","hero_subheading":"","footnotes":""},"class_list":["post-37","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/marbledesign.com.tr\/index.php?rest_route=\/wp\/v2\/pages\/37","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/marbledesign.com.tr\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/marbledesign.com.tr\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/marbledesign.com.tr\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/marbledesign.com.tr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=37"}],"version-history":[{"count":1,"href":"https:\/\/marbledesign.com.tr\/index.php?rest_route=\/wp\/v2\/pages\/37\/revisions"}],"predecessor-version":[{"id":42,"href":"https:\/\/marbledesign.com.tr\/index.php?rest_route=\/wp\/v2\/pages\/37\/revisions\/42"}],"wp:attachment":[{"href":"https:\/\/marbledesign.com.tr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=37"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}